JudulTinjau Pelaksanaan Pekerjaan Lapis Pondasi Agregat Kelas A Pada Proyek Rekonstruksi Dan Rehabilitasi Jalan Palupi Simoro |
Nama: MUHAMMAD DAHLAN |
Tahun: 2021 |
Abstrak The road is a land transportation infrastructure that includes all parts of the road, including complementary buildings and equipment for traffic, which is on the ground surface, above ground level below ground or water, as well as Above the water surface, except the railway road. The goal is to compare between the technical implementation of the foundation on the aggregate class A in the field with relevant theories and specifications. The benefit of this final task is to provide an overview of the technical implementation of the foundation of class A on the fixed residential roads (phase I) and understand the stages of the work. From the results of the foundation work process on the aggregate class A in the field is 1.) On the implementation of the foundation Lapis work on aggregate class A materials and equipment used in the field is already in accordance with specifications. 2.) material brought to the job site according to the required specifications. 3.) Stages – The stage of the foundation of Grade A's aggregate work complies with specifications. 4.) On the implementation of the foundation of class A in aggregate work in the field, solid thickness of 15 cm. This has the appropriate specification where the maximum solid thickness for the foundation of the aggregate of class A should not exceed 18 cm. 5.) From the results of density testing in the field by using Sand Cone in several STA, obtained the density result according to the specifications for the foundation of the aggregate A class of 100%. Keywords: Grade A Class Aggregate Foundation (LPA) |