JudulTINJAUN PELAKSANAAN PEKERJAAN LAPIS PONDASI AGREGAT KELAS A DAN LAPIR PERMUKAAN HRS WC PADA PROYEK REKONSTRUKSI DAN REHABILITAS JALAN BIROMARU PALOLO DAN AKSES HUNTAP |
Nama: ZULKARNAIN |
Tahun: 2020 |
Abstrak The road is a land transportation infrastructure covering all parts of the road, including complementary buildings and equipment for traffic, which is on the surface of the ground, above ground level below ground or water, as well as above the water surface, except the railway. The goal is to compare between the technical implementation of the Layer Foundation over the aggregate of class A and surface layer HRS-WC in the field with relevant theories and specifications. The benefit of this final task is to provide an overview of the technical implementation of the Layer foundation of class A aggregates and the surface layer of HRS-WC on fixed residential roads and understand the stages of the work. From the results of the foundation work process on the aggregate of class A and the surface layer HRS-WC in the field IE 1.) On the implementation of the foundation Lapis work on aggregate class A materials and equipment used in the field is already in accordance with specifications. 2.) on the execution of the work of lapis surface HRS-WC material and equipment used in the field is already in accordance with the specifications. 3.) material brought to the job site according to the required specifications. 4.) Stages – Stages of work on the foundation of grade A and the surface of HRS-WC layer are compliant with specifications. 5.) from the results of density testing in the field by using Sand Cone in several STA, obtained the density result according to the specifications for the foundation layer of the aggregate A class of 100%. Keywords: Layer foundation aggregate Class A (LPA) and layer surface HRS-WC |