JudulEFEKTIVITAS TENAGA KERJA KONSTRUKSI TERHADAP KETEPATAN WAKTU PELAKSANAAN PROYEK GEDUNG DI KOTA PALU (STUDI KASUS PADA PEMBANGUNAN GEDUNG UIN) |
Nama: LUCKY DIMITRI LUMANGA |
Tahun: 2023 |
Abstrak Efektivitas Tenaga Kerja Konstruksi Terhadap Ketepatan Waktu Pelaksanaan Proyek Gedung Di Kota Palu (Studi Kasus Pada Pembangunan Gedung UIN Palu) (Lucky Dimitri Lumanga, Fahira F) ABSTRAK Tenaga kerja merupakan salah satu faktor penting dalam pelaksanaan proyek konstruksi. Tenaga kerja yang digunakan biasanya tidak perorangan tetapi dalam bentuk kelompok tukang, yang terdiri dari kepala tukang dan pembantu tukang dan mempunyai proporsi kerja masing masing. Salah satu faktor yang perlu diperhatikan dalam menilai kelompok kerja tukang adalah mengetahui nilai efektivitas waktu kerja tukang. Penelitian ini dilakukan dengan menggunakan metode survei lapangan mengamati kinerja tukang lalu melakukan perhitungan dengan membandingkan waktu kerja riil yang di peroleh dari pengukuran pengamatan di lapangan dengan waktu kerja teoritis yang di hitung berdasarkan jam kerja pada umumnya, yang kemudian disesuaikan dengan teori teori yang ada pada literatur. Selanjutanya waktu kerja riil dihitung efektivitas dari waktu kerja teoritis, baik untuk ukuran masing masing kelompok maupun tukang secara keseluruhan. Perbandingan juga di hitung untuk mengetahui efektivitas dari faktor umur, pengalaman kerja dan pendidikan. Dari hasil pengamatan dan perhitungan untuk faktor usia waktu kerja efektif tertinggi di dapat dari kelompok umur 25-<30 tahun yaitu 98,109%, untuk faktor pengalaman kerja didapat waktu kerja efektif tertinggi dari kelompok pengalaman kerja 5-<10 tahun yaitu 97.929?n untuk faktor pendidikan waktu kerja efektif tertinggi di dapat dari kelompok kerja dengan pendidikan SMP yaitu 98,029%. Sedangkan kelompok tukang yang memiliki waktu kerja efektif tertinggi adalah tukang kelompok B dengan efektivitas waktu kerja 97,973%. Kata kunci : Efektivitas, Tenaga Kerja, Konstruks Effectiveness Of Construction Workers On The Timeliness Of Building Project Work In Palu City (Case Study On Uin Building Construction) (Lucky Dimitri Lumanga, Fahira F) ABSTRACT Manpower is one of the important factors in the implementation of construction projects. The labor used is usually not individual but in the form of a handyman group, which consists of a chief handyman and a handyman assistant and has their respective proportions of work. One of the factors that need to be considered in assessing the artisan working group is knowing the effectiveness of the workman's working time. This research was conducted using a field survey method to observe the workman's performance and then perform calculations by comparing the real working time obtained from the measurement of observations in the field with the theoretical working time which is calculated based on working hours in general, which is then adjusted to the existing theories in the literature. . Furthermore, the real working time is calculated on the effectiveness of the theoretical working time, both for the size of each group and for the workers as a whole. Comparisons are also calculated to determine the effectiveness of the factors of age, work experience and education. From the results of observations and calculations for the age factor , the highest effective working time was obtained from the age group of 25-<30 years, namely 98.109%, for the work experience factor, the highest effective working time was obtained from the group of 5-<10 years of work experience, namely 97.929% and for the factor of work experience. The highest effective working time education was obtained from the working group with junior high school education, namely 98.029%. Meanwhile, the group of artisans who have the highest effective working time is group B with an effectiveness of 97.973%. Keywords : Effectiveness, Labor, Construction |