JudulIDENTIFIKASI DAN PENILAIAN EFISIENSI PRODUKTIVITAS EXCAVATOR BUCKET DAN EXCAVATOR GRAPLE PADA PROYEK KONSTRUKSI TANGGUL KOTA PALU (STUDI KASUS :PROJECT REHABILITATION AND RECONSTRUCTION OF PALU COASTAL PROTEKTUAL – CENTRAL SULAWESI) |
Nama: MUHAMMAD TAUFAN RIFAI |
Tahun: 2023 |
Abstrak Identifikasi dan Penilaian Efesiensi Produktivitas Excavator Bucket dan Excavator Graple Pada Proyek Konstruksi Tanggul Kota Palu (Studi Kasus Project Rehabilitation and Reconstruction of Palu Coastal Protection Structure – Central Sulawesi) Muhammad Taufan Rifai, Fahira F ABSTRAK Dalam setiap proyek konstruksi tentunya akan selalu memperhatikan tentang Manajemen Mutu proyek, Sebelum melaksanakan proyek, tentunya pihak pelaksana proyek akan menyusun suatu perencanaan yang matang agar mutu konstruksi akan terjamin.Tujuan penelitian adalah untuk mengidentifikasi dan menilai efesiensi produktifitas alat berat excavator bucket dan excavator graple terhadap biaya, mutu, dan waktu pada proyek konstruksi Tanggul. Metode penelitian menggunakan metode wawancara dan observasi. Hasil identifikasi terhadap efesiensi produktivitas excavator bucket dan excavator grapple yang dilakukan menggunakan metode analisa data perhitungan produktivitas alat berat pada proyek konstruksi tanggul di Kota Palu menghasilkan data biaya excavator graple yaitu Rp 229.167,00,- per-jam dan biaya excavator bucket yaitu 312.500,00,- per-jam. Kemudian berdasarkan data mutu hasil pekerjaan excavator graple dan Excavator Bucket menghasilkan mutu pekerjaan yang sama yaitu sesuai gambar rencana dan menghasilkan susunan badan tanggul yang rapih. Dan berdasarkan waktu pelaksanaan pekerjaan penyusunan badan tanggul sepanjang 50 meter dengan volume pekerjaan yang sama yaitu 1.203,678 m³ excavator graple dalam menyelesesaikan pekerjaan yaitu 16 jam dan excavator bucket dapat menyelesaikan pekerjaan dalam waktu 22 jam. Kata Kunci : Manajemen Mutu, efesiensi Produktivitas alat berat. Identification and Assessment of Productivity Efficiency of Excavator Bucket and Excavator Graple on Embankment Construction Projects Palu City (Case Study of Project Rehabilitation and Reconstruction of Palu Coastal Protection Structure – Central Sulawesi) Muhammad Taufan Rifai, Fahira F ABSTRACT In any construction project course will always concerned about the quality management of the project, before carrying out the project, of course, the executor of the project will construct a careful planning so that the quality of construction will terjamin.Tujuan research is to identify and assess the efficiency of the productivity of heavy equipment excavator bucket and excavator graple against cost, quality, and time on the embankment construction project. The research method uses interview and observation methods. The results of the identification of the productivity efficiency of the excavator bucket and excavator grapple which were carried out using the data analysis method for calculating the productivity of heavy equipment on the embankment construction project in Palu City resulted in thecost data excavator graple being Rp. 229.167.00,- per hour and the excavator bucket costing being 312.500.00 ,- per hour. Then based on the quality data of the work of the excavator graple and the excavator bucket, it produces the same quality of work, which is according to the plan drawings and produces a neat arrangement of the embankment bodies. And based on the execution time of the construction of the 50 meter long embankment body with the same work volume, namely 1,203,678 m, the excavator graple in completing the work is 16 hours and the excavator bucket can complete the work within 22 hours. Keywords: Quality Management, efficiency Productivity of heavy equipment. |