JudulPengendalian Biaya Dan Waktu Menggunakan Earned Value Concept (Studi Kasus: Reconstruction Of Islamic University Of Palu) |
Nama: ANDI NOVARIAWATI |
Tahun: 2022 |
Abstrak The success of a project in achieving its objectives cannot be separated from proper planning and control. The effectiveness and efficiency of the project objectives is one indication of the success of the project. In a building construction project, of course, it is necessary to control costs and time so that the project can be controlled properly to achieve its effectiveness and efficiency objectives. In this study, researchers conducted an analysis of costs and time using The Earned Value Method which can estimate the total project cost to completion, the time needed to complete the remaining work and evaluate the work performance on the project by taking a case study of The Project Reconstruction of Islamic University of Palu which is a contract value IDR 93.315.000.000,00. To analyze the project, interview data were used to obtain direct costs as well as weekly reports and the actual S Curve up to the 15th week. With the results of the data analysis, it was obtained BCWS, BCWP, ACWP, SV, CV, SPI and CPI which were then carried out calculations based on data until the fifteenth week of the project, genereted BEAT value is IDR 93.766.778.388,00, SEAC is 43 weeks and work perfomance when week 7 to 11 week are doing well and was profitable but when week 2 to 6, also week 12 to 15 of the work done, project is losing money with the job going well. |